Frequently asked questions
Answers about seed-processing equipment, process design, capacity planning and integrated plant solutions.

How do I choose the right machine?
Consider crop type, incoming material, target purity, throughput, moisture and downstream process steps together.
What determines machine capacity?
Capacity depends on the crop, moisture, impurity level, quality target and machine configuration. Published ranges are for preliminary planning.
Will the stated capacity be the same for every crop?
No. Performance can vary by crop and quality target. Final figures should be validated against the actual application conditions.
Can a product sample be tested?
A sample evaluation may be arranged depending on the machine and available testing facilities. Sample quantity and test scope should be agreed in advance.
Which seeds and grains can be processed?
Depending on the configuration, solutions may be evaluated for cereals, pulses, oilseeds and various planting seeds.
Can a complete processing line be planned?
Yes. Receiving, pre-cleaning, separation, grading, optical sorting, storage and packaging can be considered as one process flow.
Can I add a machine to an existing plant?
Integration can be assessed by reviewing the current line, bottlenecks, connection points, building dimensions and utilities.
When is an optical color sorter used?
It separates unwanted kernels based on differences in color, tone or visual characteristics. Results depend on the product and settings.
What does a gravity separator do?
It helps separate material of similar size by density and weight differences. Airflow, deck settings and feed conditions affect performance.
What is a zig-zag air separator used for?
It uses airflow to separate lighter particles. Results depend on particle behavior, airflow rate and machine settings.
What does a grading machine do?
It separates product into size fractions using selected screen openings and machine settings. Screens should match the crop and target fractions.
What is a spelt huller used for?
It supports hull removal from spelt and suitable similar products. Results vary with crop condition and machine settings.
How much floor space does a plant need?
Space requirements depend on line configuration, machine dimensions, maintenance access, material flow and building height.
How are electrical power and compressed-air needs calculated?
Installed power and air consumption should be calculated from the technical data of the selected equipment and operating conditions.
Can layout plans and technical drawings be provided?
Depending on project scope and design stage, machine layouts, process-flow diagrams and required technical documentation can be prepared.
What is the delivery lead time?
Lead time depends on configuration, production schedule, order scope and shipping conditions; it is confirmed for each project.
Is installation and commissioning support available?
Installation and commissioning can be scoped to project needs. Site readiness, technical staffing and travel arrangements should be defined beforehand.
Can operator training be included?
Training can be scoped to the project and may cover safe operation, basic settings, daily checks and maintenance.
Can spare-parts planning be included?
Critical parts and suggested stock levels can be planned based on the equipment list, operating intensity and replenishment lead times.
How are warranty conditions defined?
Warranty duration, coverage and exclusions should be clearly stated in the relevant equipment contract and technical documents.
What information should I provide for a quotation?
Crop, target throughput, existing process, quality requirements, project country and scope help establish the initial technical requirements.
Are there solutions for smaller operations?
Compact machines or smaller processing lines may be considered according to capacity and available space.
Can lines be designed for industrial throughput?
High-throughput projects should consider product flow, parallel equipment, storage, automation and utilities as a complete system.
Are food safety and product-contact surfaces considered?
Contact materials, cleaning requirements and applicable standards should be specified according to the product and target market.
Do project examples represent completed installations?
Illustrative concepts and sample layouts should not be treated as completed installations or customer projects unless independently verified.
Can international projects be supported?
International projects can be assessed according to scope, language, logistics, local regulations and on-site support requirements.